• HOME
  • SOLUTIONS
    • ELECTRICAL&iNTRUMENTATION
    • TELECOMMUNICATIONS
    • SECURITY & SAFETY SERVICES
  • INDUSTRY
    • OIL&GAS
    • MANUFACTURING
    • POWER
    • TRANSPORTATION
  • OUR-COMPANY
    • OUR CLIENTS
    • oems
  • PROJECTS
    • PROJECTS GALLERY
  • CONTACT-US
SIELTE NIGERIA LIMITED SIELTE NIGERIA LIMITED SIELTE NIGERIA LIMITED SIELTE NIGERIA LIMITED SIELTE NIGERIA LIMITED
  • HOME
  • SOLUTIONS
    • ELECTRICAL&iNTRUMENTATION
    • TELECOMMUNICATIONS
    • SECURITY & SAFETY SERVICES
  • INDUSTRY
    • OIL&GAS
    • MANUFACTURING
    • POWER
    • TRANSPORTATION
  • OUR-COMPANY
    • OUR CLIENTS
    • oems
  • PROJECTS
    • PROJECTS GALLERY
  • CONTACT-US

COMPLETED PROJECTS

CONTACT US TODAY
S/NPROJECT NAMECONTRACTOR/ COMPANY ACTIVITY DESCRIPTIONYEARS
ONGOING PROJECTS
000AANOH PROJECT – IT/TELECOMMUNICATION SYSTEMS WITH TOWER & TELECOM BUILDINAAJV / SPDCEPCC contract for the realization of an integrated Telecommunication Infrastructure for the entire site - FLB/PTF/Upstream Facility: Cabling Network, LAN/WAN, Telephone, Access Control System (ACS), CCTV, FIDS, PAGA, Microwave Transmission Link, UHF TETRA, Meteorological, VHF Aviation Radio, IPTV, Telecom Supervisory, 120m high Telecom Tower and Telecom Building including HVAC System, Electrical and F&G Works.2023-Ongoing
000BONGOING PROJECTDANGOTE FERTILIZERTermination & Testing: 52KV, 630SQMM XLPE Amoured Cable on STG2-3 Transformer2023- Ongoing
0001NLNG TRAIN 7 PROJECTSAIPEM/DAEWOO/NLNGElectrical UPS, Environmental Monitoring and Fire Suppression System2022
0002GBARAN – ENWHE 3A PROJECT - PACKAGE 2 (INSTALLATION OF PIPELINE AND INTERSITE COMPOSITE CABLE)MORPOL/SPDCSplicing, Testing & Commissioning of Intersite Composite (HV/FO) Cables.2020
- 2021
0003OKPAI INDEPENDENT POWER PROJECT – PHASE IISAIPEM/NAOCInstallation and Testing of High Voltage (330kV) Air-Insulated Switchyard at Okpai and Onitsha Substation, including installation and testing of Control and Monitoring System, Earthing & Lightning, LV & MV Plant Lighting systems and associated cabling, etc.2018
- 2019
0004SSAGS PROJECTDESICONProvision of Instrumentation System Commissioning, Electrical System Installation & termination2017
- 2018
0005SSAGS PROJECTSAIPEM/SPDCEPCC contract for the realization of Telecommunication Systems: Structured Cabling Network, LAN/WAN, Telephone, ACS, CCTV, IDS, PAGA, Microwave Transmission Link, and UHF TETRA, Fiber Optic Links and 45m high Telecom Towers at various sites.
HVAC System Installation, Electrical Installation
& Terminations Works in Substations & Electrical Switch Room (ESR)
2012
- 2019
0006SHELL RA PHC (IDS & CONTROL ROOM INFRASTRUCTURE)SPDCEPCC Contract for the provision of Perimeter Fence Intrusion & Detection System round the SHELL RA Ph.
EPC contract for the provision Electronic Control Room Infrastructure and Operator Training for Shell RA Ph. Security System.
2015
- 2016
0007GBARAN INFILL PACKAGE 2MORPOL/SPDCEPCC contract for the Telecommunications & Security Systems service for the Morpol Construction Camp. (CCTV, PAGA, LAN/WAN, FOC, Tetra)
Supervision of Composite Cable Laying, Splicing, Termination & Testing of Composite Cable.
2014
- 2016
0008OTUMARA-SAGHARA- ESCRAVOS AG SOLUTIONS PIPELINESAIPEM/SPDCDetailed Engineering & Installation contract for the realization of Intersites Fiber Optic Cable links.2013
- 2016
0009OML58 UPGRADE - OUR PIPELINEZBJVL/TOTALEPCC contract for the realization of the Fiber optic and Microwave Radio Links for communication.
Installation and Testing of the Sensing Fibre Optic Cable for the Leak and Shock Detection System for Pipeline Protection.
EPCC contract for the realization of the
2010
- 2016
0010KOLO CREEK – OB/BO PIPELINENAOCRestoration of Intersites Fiber Optic Cable along NAOC OB/OB – Kolo Creek Pipeline:
Phase 1: NAOC OB/OB to NLNG Ubeta Node Phase 2: NLNG Ubeta Node to NAOC Kolo Creek
2011
- 2014
0011OML58 UPGRADE – PHASE 1SAIPEM/TOTALEPCC contract for the realization of the following Plant Telecommunication Systems: Hotline Telephone, PA/GA and Intrusion Detection Systems (IDS).2009
- 2015
0012ESCRAVOS GTL PROJECTS.G.C. (KBR- Snamprogetti JV)/CHEVRONEPCC contract for the realization of the following Plant Telecommunication Systems: IDS, CCTV (Security, Process & IR/Thermal), PAGA and ACS.2006
- 2015
0013MTN BACKBONE UPGRADEMULTILINKS-NORTELInstallation of 150m High Telecom Towers at various sites in Nigeria.2009
- 2010
0014GBARAN-UBIE INTEGRATED OIL & GAS PROJECTALCON/SPDCInstallation of the following Telecom systems at the Residential areas (FLB): IDS, Supervisory CCTV, ACS, PAGA, Telephone, LAN, Marine VHF and Microwave Radio Systems.2008
- 2010
0015GBARAN-UBIE INTEGRATED OIL & GAS PROJECTSAIPEM/SPDCEPCC contract for the realization of the following Plant Telecommunication Towers:
 120m High Telecom Tower at GBARAN FLB
 55m High Telecom Tower at KOLO CREEEK FLB
 55m High Telecom Tower at ZARAMA NAG MANIFOLD
EPCC contract for the realization of the following Systems: Fiber Optic and HV cabling Systems
2008
- 2010
0016OKOLOMA PROJECTALCON CONTRACTING NIGERIA LMITED / SPDC33KV and Fiber Optic Cables: Supervision, Splicing, Termination and Commissioning.2008
- 2010
0017WNC RMAC PROJECTComputer Sciences Corporation for Nigerian NavyAIS and Radar System: Civil work / Tower Erection / System installation / Commissioning2008
- 2009
0018NLNG SIX PROJECTT.S.K.J. (Technip- Snamprogetti-Kellogg Brown & Root)/NLNGEPCC contract for realization of the following Plant Telecommunication Systems: Telephone, LAN, PAGA, CCTV, IDS, VHF, MARINE VHF, and
Access Control System for Train 6 LNG production
2005
- 2008
0019NLNG PROJECTJulius Berger Nigeria limited / E.T.C.ONLNG Residential Area 1 - New 54 Houses - Plant
- New Buildings, CCR, New and Refurbish Administration, Supply, Installation and Commissioning of: CATV / Telephone System, LAN / Low Voltage
2005
– 2006
0020NLNG PLUS EXPANSION PROJECTT.S.K.J. (Technip- Snamprogetti-Kellogg Brown & Root)/NLNGEPCC contract for realization of the following Plant Telecommunication Systems: Telephone, LAN, PAGA, CCTV, IDS, VHF,
MARINE VHF, and Access Control System for Train 4 & 5 LNG production
2003
- 2005
0021NLNG Network Expansion ProjectT.S.K.J. (Technip- Snamprogetti-Kellogg Brown & Root)//NLNGEPCC contract for realization of the following Plant Telecommunication Systems: Telephone, LAN, PAGA, CCTV, IDS, VHF,
MARINE VHF, and Access Control System for Train 3 LNG production
2000
- 2003
0022NLNG BASE PROJECTT.S.K.J. (Technip- Snamprogetti-Kellogg Brown & Root)/NLNGEPCC contract for realization of the following Plant Telecommunication Systems: Telephone, LAN, PAGA, CCTV, IDS, VHF,
MARINE VHF, and Access Control System for Train 1 & 2 LNG production
EPCC contract for realization of the following Residential (FLB) Telecommunication Systems: Telephone, Entertainment, Fiber Optic cable network.
EPCC contract for the realization of the following:
 90m Telecom Tower at NLNG R.A, Bonny.
 96m Telecom Tower at Amadi Creek, Port Harcourt.
1996
- 2000

TECHNOLOGY BIRTHS SOLUTIONS

Get In Touch With Us
  • 16 Omerelu Street, GRA Phase1, Port Harcourt, Rivers States, Nigeria.
  •  info@sieltenigeria.com
  •  +234 807 901 0021
  • +234 807 798 6625
  • +234 803 310 4915
  • +234 908 260 8882
© Sielte Nigeria Limited 2023
  • HOME
  • SOLUTIONS
  • INDUSTRY
  • OUR-COMPANY
  • PROJECTS
  • CONTACT-US